Fence Permits in Upper Saucon Township (Center Valley, PA): Heights, Corner Lots, and How to Apply

Black aluminum fence on a corner lot, set back from the sidewalk to keep the intersection sight line clear

Planning a fence in Center Valley? Upper Saucon Township requires a zoning permit for almost any fence, and its zoning ordinance sets its own height limits and clear-sight rules. This guide covers the Upper Saucon Township fence permit process in plain English: heights, placement, corner lots, pools, new construction, and how to apply. Ordinances change, so confirm current rules with the township’s Zoning Officer before you dig.

First: are you actually in Upper Saucon Township?

Center Valley isn’t its own municipality. It’s a community inside Upper Saucon Township in southern Lehigh County. But a mailing address doesn’t always tell you which rules apply. Coopersburg Borough is almost entirely surrounded by Upper Saucon but has its own zoning ordinance, and homes near the township line may fall in a neighboring municipality. Your tax bill or county property records will settle it. Everything below applies to Upper Saucon Township only.

Do you need a fence permit in Upper Saucon?

Almost certainly yes. The township’s Building Permit Information page states that a zoning permit is required for all fences other than underground dog fences.

The same page lists any fence higher than 6 feet among the projects that also need a building permit under the Pennsylvania Uniform Construction Code (UCC). Most residential fences stay at or under 6 feet, so for most homeowners the zoning permit is the main hurdle.

Height limits: front, side, and rear yards

Fence and wall rules are in Section 306 of the Upper Saucon Township Zoning Ordinance of 2009 (Ordinance 141). The height rules in § 306.A were last rewritten by Ordinance 141-M in April 2017, and Ordinance 141-P later adjusted which zones the section covers. As currently amended, § 306.A applies in the township’s SMC, A, R-1, R-2, and R-3 zones, which is where most single-family homes are. Within required yard areas, a fence or wall can’t be taller than 4 feet, with two exceptions:

  • Side and rear yards: up to 6 feet.
  • Reverse frontage lots (lots with streets front and back): up to 6 feet in the front yard that doesn’t have driveway access.

For a typical lot, that’s 4 feet in front and 6 feet along the sides and back. Up front, think 4-foot picket, split rail, or aluminum. Our front yard fence ideas post has styles that fit under that limit. Separate rules cover agricultural fences, tennis court fences, and retaining walls. In the township’s commercial, industrial, and Enterprise zones, § 306.C allows up to 10 feet.

Other fence rules in Section 306

  • Finished side out (§ 306.B): The finished side has to face outward, away from your property. Plan on the neighbors seeing the “good side.”
  • No barbed wire or electric fencing (§ 306.F): Both are prohibited except for agricultural fences used to contain livestock.
  • Durable materials (§ 306.H): No discarded materials, and no corrugated metal, corrugated fiberglass, or sheet metal fences.

Section 306 doesn’t set a separate minimum distance from the property line for residential fences. The fence still has to be on your property, and easements, HOA rules, or deed restrictions can push it farther in. If your survey pins are missing, sort that out before posts go in.

Corner lots: two front yards and a sight triangle

Under the ordinance’s definition of front yard (as amended by Ordinance 141-A), a corner lot has a front yard along each street it touches. So the 4-foot limit can apply along the side street too, not just in front of your door.

On top of that, § 306.E says no fence can block the clear sight triangles in §§ 301.C, 303, and 304.C:

  • Corner lots (§ 303.A): A clear sight triangle of at least 100 feet measured along the centerline of local or collector streets, or at least 150 feet along an arterial street. Nothing over 30 inches tall is permitted inside it. The ordinance says the triangle must be shown on sketch plans for zoning permit applications.
  • Driveways (§ 304.C): A clear-sight triangle of 75 feet along the street centerline and 5 feet along the driveway centerline. No permanent obstructions over 30 inches.

A 4-foot fence that meets the front yard limit can still be a problem inside one of those triangles. Show them on your plot plan and ask the Zoning Officer if you’re unsure.

Pool fences

Under § 472 of the zoning ordinance, residential pools can’t be in the front yard, must be set back at least 15 feet from side and rear lot lines (measured from the decks, patios, and equipment around the pool), and must meet the fencing and gate requirements in the UCC. The township’s permit page lists in-ground pools and any pool with a water depth of 24 inches or more as needing a building permit. If your fence doubles as a pool barrier, design it around the barrier requirements first. Our pool fence rules guide walks through what inspectors usually check.

Just built a new home? Grading comes first

Under Ordinance 141-DD (March 2025), for lots subject to the township’s individual lot grading plan rules, Upper Saucon won’t accept applications for new construction activity on the lot, including permits for fences and pools, until a Final Certificate of Compliance is issued. That certificate follows the Township Engineer’s approval of the as-built final grading plan, so ask your builder where it stands before you schedule a fence. Our new construction fence guide covers the rest of the timing.

How to apply and who to call

  • Form: Use the Zoning Permit Application on the township’s Forms and Applications page at uppersaucon.org.
  • Plot plan: Required. The form asks for a plot plan showing existing structures, the proposed work, and distances to property lines. Applications without it are considered incomplete. Add fence heights, gates, and street frontages.
  • Trees: The application asks whether the work requires tree removal. If it does, you’ll need a Tree Removal Permit application too.
  • Over 6 feet: Expect a building permit application in addition to zoning.
  • Fees: Set by the Board of Supervisors in the township’s Comprehensive Fee Schedule. Check the current schedule or ask Community Development.
  • Contact: Upper Saucon Township, 5500 Camp Meeting Road, Center Valley, PA 18034 · 610-282-1171 (the permit page lists the Zoning Officer at ext. 1254).

An approved zoning permit doesn’t override HOA covenants or deed restrictions. If your neighborhood has its own fence standards, get that approval before or alongside the township application.

Call 811 before you dig

Pennsylvania law requires a PA One Call (811) request before digging so underground utilities get marked. That applies to every post hole. Private lines like irrigation or lamp posts usually aren’t marked, so flag them. Our before you dig / 811 guide explains how it works.

How 76 FENCE BucksMont handles Upper Saucon permits

Center Valley is part of our northern service area, along with Coopersburg, Quakertown, Perkasie, and Allentown. When you hire us, we handle the fence permit paperwork and the PA One Call request as part of the job, and we lay out the fence around your front yard limits and any sight triangles before posts go in. Rules shift from town to town. Compare our guides to Quakertown Borough and Horsham Township fence permits.

This is a plain-English summary of Upper Saucon Township’s Building Permit Information page, its Zoning Permit Application, and Zoning Ordinance 141 §§ 113 (yard and lot definitions), 303, 304.C, 306, and 472, as amended by Ordinances 141-A, 141-M, 141-P, and 141-DD. It isn’t a substitute for confirming current rules with the township before you build.

Planning a fence in Center Valley? Request a free on-site estimate through our contact page, or call our Doylestown office at 215-602-4334. We’ll walk the property and explain what Upper Saucon will need before any work starts.